Explore a scope and request a reviewed quote. Coastal confirms service availability, qualified trade partners, site conditions and final pricing before a proposal.
DOORS & HARDWARE
French doors
Install paired hinged doors with confirmed active panel, swing and clearances. Exterior French doors need a coordinated weather-sealing system; interior pairs require a different latch and trim plan.
Measure slab and frame separately. Note swing from the exterior or approach side, threshold, wall depth and existing hardware.
Typical scope to confirm
Confirm interior/exterior use and active-leaf configuration
Check opening square and door-swing clearance
Install defined frame, panels and hardware
Adjust meeting stiles, latch and threshold where applicable
Make it specific to your project.
Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.
LOW / MIDDLE / HIGH REFERENCE
Low$650per opening
Middle$3,125per opening
High$5,600per opening
Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.
A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.
HomeGuide · research checked 2026-10-22 · US national · installed
Confirm active leaf, swing clearances and weather exposure.
Prepare and approve
Confirm product fit, support, weather exposure and any opening changes.
Complete the work
Fit and fasten components; integrate seals and finish affected trim.
Review and close out
Check swing or sliding travel, latch operation, clearances and weather seals.
Planning & preparation
1–8 weeks
Work on site
1–3 working days
Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.
Custom door lead time · Frame repairs or opening alterations · Finish work and access-control coordination
PERMIT PLANNING
Check the scope and jurisdiction
Permit needs depend on the work and property address. OKC and Edmond review structural alterations; Moore requires permits for most remodels. Confirm finish-only exceptions and any separate trade permits.
Changes to walls, structure or building use
Electrical, plumbing or HVAC changes
Work within a floodplain or historic district
ENGINEERING & DESIGN
Engineering is not usually needed
Engineering is not usually part of this finish-only scope. Stop for review if hidden damage, structural changes or unusual support loads are found.
New structural work or damaged framing
Unverified heavy-load support
Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.
Plan weather seals and room clearance for inward-opening panels.
Door type: French
Custom product, finish code, or request: Exterior inswing pair. Finish direction: Dark bronze. Plan weather seals and room clearance for inward-opening panels.
Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.