Shower waterproofing

Create the concealed water-management layer behind the shower tile and at the base. The work is defined as a continuous assembly with compatible drains, corners, penetrations, and transitions before tile is installed.

Bathroom with a walk-in shower beside a window
Alex Tyson · Unsplash License Stock reference photograph; not a Coastal project or specified product.

START WITH THE DETAILS

What goes into
the work.

Measure the existing base and wall height. Record drain location and threshold. Final product dimensions and waterproofing compatibility need verification.

Typical scope to confirm

  • Confirm substrate, drain type, and the selected waterproofing system
  • Detail seams, corners, penetrations, niches, and base-to-wall transitions
  • Complete the required water test and record the assembly before covering it

Make it specific to your project.

Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.

SCOPE-SPECIFIC PRICING

Your scope sets the price.

Concealed waterproofing for a measured shower assembly, including transitions and testing. A numeric range is withheld until the scope and relevant costs are known.

A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.

Schluter Systems · Schluter Systems · research checked 2026-10-22

Continue with these selections ↗

What changes the price

  • Total treated area and geometry
  • Membrane system and drain compatibility
  • Niches, benches, curbs, and penetrations
  • Substrate repair and access to existing work
What the reference covers
  • Confirm the written scope and responsibility for each item.
Allow for these separately
  • Tile, glass, fixtures, and finish surfaces unless listed
  • Patching an unverified failed assembly without establishing a repair boundary
  • Scope beyond the written proposal

KNOW WHAT COMES NEXT

From first idea to finished work.

  1. Plan the scope

    Identify the complete waterproofing system and how it meets the drain and penetrations.

  2. Prepare and approve

    Confirm plumbing, substrate condition and product availability before removal.

  3. Complete the work

    Install the approved drain/base, waterproofing and walls in the system sequence.

  4. Review and close out

    Complete required checks and cure times before use; review seals and care.

Planning & preparation
2–8 weeks
Work on site
4–15 working days

Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.

Tile versus prefabricated walls · Drain relocation and concealed repairs · Waterproofing checks, cure time and glass

PERMIT PLANNING

Check the scope and jurisdiction

New or altered electrical, plumbing and mechanical systems need permit review. Edmond lists limited minor-repair exceptions; OKC directs permitted trade work through licensed, registered contractors.

  • New circuits, relocated fixtures or altered piping
  • New or altered heating, cooling, gas or exhaust systems
  • Changes beyond the local minor-repair exemption

ENGINEERING & DESIGN

Engineering is not usually needed

Engineering is not usually part of this finish-only scope. Stop for review if hidden damage, structural changes or unusual support loads are found.

  • New structural work or damaged framing
  • Unverified heavy-load support

Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.

Local permit & engineering sourcesOklahoma City — Development Center requirements ↗ Edmond — when a permit is needed ↗ Edmond — residential alteration checklist ↗

MAKE IT FIT YOUR HOME

Your starting options.

Compare the scope before choosing products. Any direction can be refined with Coastal.

01

Sheet membrane assembly

Use a documented compatible sheet system and accessories.

Plan this option
02

Liquid-applied assembly

Select an approved system and follow its coverage, reinforcement, and curing requirements.

Plan this option

MATERIALS & DETAILS

Coordinate the details.

Waterproofing is concealed. Choose the compatible assembly here; visible tile, grout, trim, and wall finishes belong to their separate selections.

? × ? in baseShower waterproofing
Shower waterproofing. 1 each. Illustrative configuration, not a construction drawing.

Illustrative scope diagram · not a construction detail.

PRODUCT RESEARCH

Brands & real-world examples.

Manufacturer references help compare options. They do not imply a Coastal dealership, endorsement, or a product selected for your project.

Explore example photos

Open the original source for product and installation imagery. These are reference links, not Coastal project photographs.

YOUR PROJECT, VISUALIZED

Choose a direction.
See it in your space.

Start with common shower waterproofing options, personalize the details, then upload a photo to create an AI concept.

Sheet membrane assembly

Use a documented compatible sheet system and accessories.

  • Waterproofing: Approved sheet membrane
  • Custom product, finish code, or request: Sheet membrane assembly. Use a documented compatible sheet system and accessories.
Use this look

Liquid-applied assembly

Select an approved system and follow its coverage, reinforcement, and curing requirements.

  • Waterproofing: Approved liquid membrane
  • Custom product, finish code, or request: Liquid-applied assembly. Select an approved system and follow its coverage, reinforcement, and curing requirements.
Use this look

Factory system

Use a coordinated tray, board, seal, and drain assembly.

  • Waterproofing: Factory system
  • Custom product, finish code, or request: Factory system. Use a coordinated tray, board, seal, and drain assembly.
Use this look
Bathroom with a walk-in shower beside a window
Alex Tyson · Unsplash License Stock reference photograph; not a Coastal project or specified product.

FROM INSPIRATION TO YOUR SPACE

Explore the scope visually.

For this service, the image is a scope illustration. It cannot verify concealed conditions, engineering, code compliance or permit approval.

  1. Choose a preset and adjust its selections.
  2. Add a photo of the room or area.
  3. Create a concept, compare it, and keep it with your project.
Open the visualizer

AI concepts are illustrations. Product matches, measurements and feasibility require Coastal’s review.

YOUR NEXT STEP

Bring it into your plan.

Keep rooms, measurements and choices together in the Project Builder.

Related scopes

Research sources & pricing notes

Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.

Stock photograph license · Finish swatches and scope diagrams are original illustrations.

Harbor

Coastal’s AI project consultant

Ready to help
Coastal Construction
Optional voice conversation

Speak or type; Harbor answers aloud. Your microphone stays off until you choose voice.

Service guide · prepared Coastal answers
AI chat uses your messages and selected project details; optional voice uses audio. OpenAI processes these when AI is used. An inquiry is sent to Coastal only when you submit it.

Talk to a person
Call now · 405-872-6050