PAINTING & REFINISHING
Cabinet painting
Paint existing cabinets with a preparation and curing plan suited to their current finish. Define door removal, exposed box surfaces and the treatment of interiors before work starts.
Measure paintable area and note ceiling height, surfaces, preparation and existing coating. Count doors and cabinet fronts separately.
Typical scope to confirm
Inspect existing finish and cabinet condition
Prepare and prime specified surfaces
Apply cabinet coating and coordinate reassembly
Make it specific to your project.
Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.
LOW / MIDDLE / HIGH REFERENCE
Low$30per linear ft
Middle$50per linear ft
High$70per linear ft
Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.
Match the reference scope first
Confirm Finish before applying this reference to your quantity. The source is cabinet painting, not stain or clear refinishing.
Confirm Surface before applying this reference to your quantity. The cabinet run reference does not apply to walls, trim or exterior surfaces.
The figures above remain the source reference. They do not price these selections or a complete installed project.
A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.
HomeGuide · research checked 2026-10-22 · US national · installed
Confirm cabinet prep, door removal, finish system and cure expectations.
Prepare and approve
Protect the space, assess old coatings and clean, repair and prime surfaces.
Complete the work
Apply the specified finish system with appropriate dry times.
Review and close out
Review coverage and edges; provide color and care records.
Planning & preparation
1–4 weeks
Work on site
4–10 working days plus cure
Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.
Surface preparation and repairs · Occupied areas or exterior weather · Coating dry and cure times
PERMIT PLANNING
Usually cosmetic work
Usually a finish-only scope when the structure, room use and utilities stay unchanged. This is a starting classification, not an address-specific exemption; confirm any related regulated work before starting.
Opening walls or changing structural support
Moving or adding wiring, plumbing or ventilation
Historic exterior restrictions or regulated-material removal
ENGINEERING & DESIGN
Engineering is not usually needed
Engineering is not usually part of this finish-only scope. Stop for review if hidden damage, structural changes or unusual support loads are found.
New structural work or damaged framing
Unverified heavy-load support
Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.
Create a separate island color within a coordinated scheme.
Finish: Paint
Surface: Cabinets
Custom product, finish code, or request: Contrasting island. Finish direction: Coastal blue gray. Create a separate island color within a coordinated scheme.
Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.