Explore a scope and request a reviewed quote. Coastal confirms service availability, qualified trade partners, site conditions and final pricing before a proposal.

WHOLE-HOME & ROOM RENOVATIONS

Open-concept conversions with structural coordination

Create a larger connection between rooms using a reviewed structural opening. Coordinate the beam, supports and affected utilities with the finished ceiling and floor plan.

Specialist qualifications, responsibility and availability are confirmed for your project.

Interior renovation with exposed masonry, a wide opening, temporary supports and construction debris
Milivoj Kuhar · Unsplash License Illustrative interior demolition and layout work photographed in Croatia. Stock photograph; this is not a Coastal project or an example of specified site practices.

START WITH THE DETAILS

What goes into
the work.

Measure each room separately. Note ceiling height and walls or openings you want to change. Do not assume a wall can be removed.

Typical scope to confirm

  • Structural review and defined opening dimensions
  • Temporary support and permanent framing per approved design
  • Specified utility adjustments and finish restoration

Make it specific to your project.

Enter the amount of work and choose the details you know. Your choices follow you into the Project Builder.

LOW / MIDDLE / HIGH REFERENCE

Low$4,000per project
Middle$7,000per project
High$10,000per project

Low and high are published reference endpoints. Middle is their arithmetic midpoint, not a quoted average, product tier or firm price.

A planning reference for this service only. Selections, local labor, access, quantities and existing conditions need Coastal’s review. Do not add overlapping whole-project and component ranges.

HomeGuide · research checked 2026-10-22 · US national; not an Oklahoma quote · installed

Continue with these selections ↗

What changes the price

  • Span and loads above the opening
  • Post and footing requirements
  • Beam concealment and utility rerouting
What the reference covers
  • Wall removal and ordinary finish work in the published comparison
Allow for these separately
  • Unapproved demolition
  • Major foundation reinforcement or full-room refitting unless specified
  • Separate engineering calculations and permit charges unless quoted
  • Major new footings and kitchen replacement

KNOW WHAT COMES NEXT

From first idea to finished work.

  1. Plan the scope

    Determine which walls carry loads before any open-concept demolition.

  2. Prepare and approve

    Confirm selections and permits, protect occupied areas and phase demolition.

  3. Complete the work

    Complete approved rough work, repairs and finish installation in a coordinated sequence.

  4. Review and close out

    Test affected systems and review each room and any agreed punch items.

Planning & preparation
3–10 weeks
Work on site
3–12 weeks

Illustrative planning allowance for the stated scope, not a promised start or completion date. On-site time starts after approvals and materials are ready; procurement, inspection waits, curing and discoveries can extend the calendar.

Occupied-home phasing · Hidden damage after demolition · Custom products and multiple trades

PERMIT PLANNING

A permit is required for the stated scope

OKC and Edmond require permits for structural alterations; Edmond also includes cutting away walls or partitions. Confirm the plan and trade permits before demolition.

  • Removing, moving or cutting a wall or structural member
  • Changing a building opening or room use
  • Associated electrical, plumbing or mechanical changes

ENGINEERING & DESIGN

Confirm design requirements

Review the load path, existing supports and proposed changes before work. An engineer may be needed for nonstandard spans, added loads, damage or a reviewer-requested design; a permit alone does not mean every detail needs engineering.

  • Load-bearing changes or uncertain framing
  • Nonstandard spans, concentrated loads or damaged supports
  • Soil, foundation or retaining conditions beyond an approved design

Confirm requirements with the city or county responsible for the property before work begins. The address, exact scope and adopted code determine the final requirements.

Local permit & engineering sourcesOklahoma City — building and trade permits ↗ Edmond — when a permit is needed ↗ Edmond — residential alteration checklist ↗ Edmond — residential alteration/addition checklist ↗

MAKE IT FIT YOUR HOME

Your starting options.

Compare the scope before choosing products. Any direction can be refined with Coastal.

MATERIALS & DETAILS

Find your finish.

These original swatches show a general visual direction. Confirm a physical sample, exact finish code and product compatibility before ordering.

Interior wall direction

PRODUCT RESEARCH

Brands & real-world examples.

Manufacturer references help compare options. They do not imply a Coastal dealership, endorsement, or a product selected for your project.

USG Sheetrock

Interior gypsum repair; panel type must match the required assembly.

Explore example photos

Open the original source for product and installation imagery. These are reference links, not Coastal project photographs.

YOUR PROJECT, VISUALIZED

Choose a direction.
See it in your space.

Start with common open-concept conversions with structural coordination options, personalize the details, then upload a photo to create an AI concept.

Defined wide opening

Retain side walls with a designed beam and supports.

  • Layout: Open-concept — engineering review
  • Custom product, finish code, or request: Defined wide opening. Retain side walls with a designed beam and supports.
Use this look

Flush-ceiling review

Explore a concealed beam where the structure permits.

  • Layout: Open-concept — engineering review
  • Custom product, finish code, or request: Flush-ceiling review. Explore a concealed beam where the structure permits.
Use this look

Visible beam

Consider a dropped beam and planned trim treatment.

  • Layout: Open-concept — engineering review
  • Custom product, finish code, or request: Visible beam. Consider a dropped beam and planned trim treatment.
Use this look
Interior renovation with exposed masonry, a wide opening, temporary supports and construction debris
Milivoj Kuhar · Unsplash License Illustrative interior demolition and layout work photographed in Croatia. Stock photograph; this is not a Coastal project or an example of specified site practices.

FROM INSPIRATION TO YOUR SPACE

Explore the scope visually.

For this service, the image is a scope illustration. It cannot verify concealed conditions, engineering, code compliance or permit approval.

  1. Choose a preset and adjust its selections.
  2. Add a photo of the room or area.
  3. Create a concept, compare it, and keep it with your project.
Open the visualizer

AI concepts are illustrations. Product matches, measurements and feasibility require Coastal’s review.

YOUR NEXT STEP

Bring it into your plan.

Keep rooms, measurements and choices together in the Project Builder.

Related scopes

Research sources & pricing notes

Reviewed 2026-10-23. Published ranges describe the source’s stated scope and geography; they are not an Oklahoma adjustment or a Coastal estimate. Do not add overlapping project ranges together.

Stock photograph license · Finish swatches and scope diagrams are original illustrations.

Harbor

Coastal’s AI project consultant

Ready to help
Coastal Construction
Optional voice conversation

Speak or type; Harbor answers aloud. Your microphone stays off until you choose voice.

Service guide · prepared Coastal answers
AI chat uses your messages and selected project details; optional voice uses audio. OpenAI processes these when AI is used. An inquiry is sent to Coastal only when you submit it.

Talk to a person
Call now · 405-872-6050